Clear Filters
  • Content
  • Document Type
  • Language

Your search for "4" resulted in 481 results

  • Regulatory & Policy Update Quarter 4 2023

    This brief update is designed to share with S&C’s clients. It describes where we see important government-related drivers for change in electricity distribution. This is not meant to be a...

  • 4 Critical Data Points for Grid Modernization

    As widespread and rapid change bears down on the grid and customers demand uninterrupted power, a reliable and resilient grid has never been more important.

  • Regulatory & Policy Update Page Quarter 4 2021

    Regulatory bodies all over the U.S. are taking major steps forward to support the transition of the energy system. This includes transitioning to performance-based rate-making, requiring or...

  • Regulatory & Policy Update Quarter 3 2022

    This brief Quarter 4 update is created for S&C’s customers where we see important government-related...

  • Mark VI Circuit-Switcher

    Mark VI Circuit-Switcher offers the latest in interrupter technology. It features a 31.5-kA fault-interrupting ... interrupting time, with simultaneity of less than 1/4 cycle. No shunt-trip device is needed.

  • TCC Number 115-4.pdf

    Minimum Melting Time-Current Characteristic Curves: SM Refill Units for Voltage-Transformer Applications--S&C Standard Speed

  • TCC Number 119-4 (Excel).xlsx

    SM-4 and SM-5 Refill Units, Indoor and Outdoor Distribution, S&C Slow Speed, Minimum Melting

  • TCC Number 119-2-1-4 (Excel).xlsx

    SMU-40 Fuse Units, Indoor and Outdoor Distribution, S&C Slow Speed, Total Clearing

  • TCC Number 119-4.pdf

    Minimum Melting Time-Current Characteristic Curves: SM Refill Units-S&C Slow Speed

  • TCC Number 119-2-1-4.pdf

    Total Clearing Time−Current Characteristic Curves: SMU Fuse Units−S&C Slow Speed