Building 5 Upstairs Washroom Changes
To all S&C Canada Team Members,
Last night we implemented changes to the Men’s Washroom in building 2/3. Tonight, we made similar changes to the Men’s Washroom located in the building 5 mezzanine.
Changes to Washroom Layout
This evening, a barrier was installed between the men’s washroom and locker areas in building 5. See photo.
As a result, access to the locker area is now achievable from the door on the right while the washroom is accessible from the door on the left. Each side is limited to a maximum of 4 team members.
These changes are a result of input from team members. I’d like thank all team members for their safety improvement suggestions/feedback. Thank-You.
Regards,
Angelo
Especialista
Angelo Gravina
Fecha de Publicación
abril 28, 2020