2006 News Archive
December 12, 2006
Vista® Underground Distribution Switchgear Withstands a Hurricane.
December 5, 2006
S&C Supports Career Education and Continuing Skills Training.
November 27, 2006
November 13, 2006
PureWave UPS™ System Run Time Extended From 30 to 60 Seconds.
November 6, 2006
October 23, 2006
S&C Offerings Address Directive on Hospital Emergency Power Systems.
October 16, 2006
Power Quality—what’s your definition? Here’s S&C’s:
October 9, 2006
S&C Joins APPA RP3™ Industry Support Council.
September 26, 2006
September 25, 2006
New 69-Kv Double-Break Style Alduti-Rupter® Switch.
September 25, 2006
Technical Paper on Use of Virtual Agents to Effect Intelligent Distribution Automation
September 12, 2006
August 28, 2006
A Better Solution for Overhead Lateral Circuit Protection.
August 14, 2006
A Custom-Engineered Replacement for Liquid Power Fuses Protecting Indoor Potential Transformers.
July 31, 2006
Loadbuster® Loadbreak Tool: 50 Years and Still Going Strong.
July 24, 2006
To Reclose, or Not to Reclose: The IntelliRupter® PulseCloser solves this enduring dilemma.
July 17, 2006
Article Featuring S&C PureWave AVC® Describes Creative Control Solutions at a Wind Energy Facility.
July 11, 2006
Casino Doesn’t Gamble on Power Quality.
June 19, 2006
Mining Company Gets Clean Power Source.
June 5, 2006
Series 2000 Circuit-Switchers Rated 2000-A Continuous Now Available.
May 8, 2006
The Italian Job™ Gets a Boost from S&C PureWave AVC®.
May 2, 2006
“Advanced Feeder Automation is Here” reprint from IEEE Power & Energy Magazine.
April 25, 2006
April 18, 2006
Expanding Data Center Selects PureWave UPS™ System.
April 4, 2006
City Promotes Economic Development with High-Reliability Electric Power.
March 20, 2006
Products and Services for the Healthcare Industry.
March 14, 2006
Pad-Mounted Gear Inspection Program Helps Utility Manage Aging Assets.
March 8, 2006
February 27, 2006
Introducing the Circuit-Isolator II™ Disconnect Switch.
February 14, 2006
S&C TripSaver™ Dropout Recloser for Overhead Distribution Systems.
February 14, 2006
S&C Introduces Advanced New Device for Overhead Line Protection.
February 6, 2006
PureWave UPS™ System Cuts Power Disturbances to New Surgical Suite.
January 18, 2006
Newly Invented Electronic Shock Absorber Will Give Big Boost to Hawaii Wind Farm.
January 16, 2006
S&C Offers 10-Year Warranty for Automation Products.
January 10, 2006
Technical paper: Primary-Side Transformer Protection.
January 3, 2006
S&C’s PureWave UPS™ Systems Protect Test Labs from Power Outages.
