2003 News Archive
December 17, 2003
Introducing Coordinaide™ — The S&C Protection and Coordination Assistant.
December 8, 2003
PureWave UPS™ is Prescribed for a Medical Facility.
December 1, 2003
First Application of IntelliTEAM II® at a Major Eastern Utility.
November 17, 2003
S&C’s PureWave UPS System Manages Power Quality in College Computer Room.
November 10, 2003
Introducing New S&C Type SMD® Power Fuse with Silicone-Housed Composite Insulators.
November 10, 2003
Thanks to S&C’s PureWave UPS, August Blackout Has Little Impact on Semiconductor Production.
October 27, 2003
Technical Resources for Substation Capacitor Bank Switching.
October 21, 2003
“Wafer-Thin” Tolerance for Power Disturbances Requires Expanded System.
October 13, 2003
October 6, 2003
New Wildlife Protection for Upright Omni-Rupter® Switches.
September 5, 2003
Power Conditioning . . . What Does It Really Mean?
August 25, 2003
Automatic Source Transfer Improves Service Continuity for Mall Expansion.
August 18, 2003
Introducing the 34.5-kV Fault Tamer® Fuse Limiter.
August 11, 2003
Once Burned, Twice Shy . . . If You’re Lucky.
July 28, 2003
M Series® Switch Operator Now Has Optional Voltage and Current Sensing.
July 21, 2003
Trans-Rupter II® Model SE: A Permanent Solution for a Temporary Substation.
July 14, 2003
July 1, 2003
System VI™ Switchgear: Best Supporting Role at TV and Film Production Company.
June 23, 2003
June 16, 2003
System VI™ Switchgear with Fault Fiter® Eliminates Costly Breaker Gear in Network System.
June 9, 2003
The Evolution of a Distribution Automation Project.
June 2, 2003
Battery Reliability: An Advantage of the PureWave UPS™ System.
May 27, 2003
First Mark VI Circuit-Switcher Installations an Important Part of an Ongoing System-Wide Upgrade.
May 19, 2003
Enhanced Hookstick-Operated Lockout Option for Omni-Rupter® Switches Now Available.
May 6, 2003
Introducing 1200-Ampere System VI™ Switchgear.
April 28, 2003
New Features for the Micro-AT® Source-Transfer Control.
April 7, 2003
March 31, 2003
New Operation Counter Feature for Loadbuster® — The S&C Loadbreak Tool.
March 24, 2003
Call Center Electrical System Needs Help to “Weather the Storm.”
March 17, 2003
S&C Switchgear Enclosures Prove Tough Against Tornado’s Ravages.
March 17, 2003
Trans-Rupter II® Transformer Protector Model SE: The Perfect Fit for a Remote Industrial Substation.
March 10, 2003
WinMon® Interface and Automatic Capacitor Controls Help Midwestern Utility Stabilize System.
February 24, 2003
IntelliTEAM® Improves Reliability of Remote Substation.
February 10, 2003
February 3, 2003
S&C Introduces Cutout-Arrester Combinations.
January 20, 2003
January 13, 2003
Announcing an Enhanced Hookstick Design for Hookstick-Operated Omni-Rupter® Switches.
January 6, 2003
Locus Radios Offer High Reliability and Security in Distribution Automation Systems.
