S&C Electric Company

2001 News Archive

December 10, 2001

S&C System VI™ Switchgear: Perfect Answer for College Upgrade.

November 26, 2001

How to Determine Ambient Temperature Adjustment Factors for S&C Fuses.

November 12, 2001

Simple Way to Add Remote-Resetting Capability to Trans-Rupter II® Transformer Protector.

November 5, 2001

S&C Scada-Mate® Switching Systems with 5800 Series Automatic Switch Controls Enable Utility to Defer Capital Investments.

October 22, 2001

How to Determine Preload-Adjustment Factors for S&C Fuses.

October 15, 2001

Trans-Rupter II® Provides Enhanced Coordination with Downstream Protective Devices.

October 8, 2001

Different Choices for Source-Transfer Applications.

October 1, 2001

How to Determine the Peak-Load Capability of S&C Fuses.

September 17, 2001

Power Systems Services Awarded a Fast-Paced Turnkey Project in the Southwest.

September 11, 2001

S&C Pad-Mounted Gear Connects Generator Farm with Utility Grid.

September 4, 2001

Optional Silicone-Rubber Insulators Lend New Installation Flexibility to Phase-Over-Phase Mark V Circuit-Switchers.

August 27, 2001

What’s the Largest Residential-Scale Distributed-Generation Technology?

August 20, 2001

A Unique Solution to a Refinery’s Power Quality Problems.

August 20, 2001

Questions and Answers on Battery Life in S&C Distribution Automation Products.

August 6, 2001

EnergyLine 5802 Two-Switch Overhead Option Delivers Big Cost Savings.

July 27, 2001

First Trans-Rupter II® Model SE Installation Saves Time and Money.

July 27, 2001

Special Vista® Load Switch Fits Through Manhole Openings.

July 20, 2001

S&C’s Power Systems Services Division Wins Generation Related Turnkey Project.

July 20, 2001

Interested in the nuts and bolts behind S&C’s no-outage system installed on International Drive in Orlando, Florida?

July 16, 2001

The Effective Solution for Switching and Protection of Transmission-Voltage Capacitor Banks.

July 9, 2001

PureWave UPS™ System is Ideal Solution for Medical Testing Facility.

June 25, 2001

The High-Reliability Solution for Critical Power Users: As Good As It Gets?

June 25, 2001

Announcing a New Cypoxy® Bus Support Insulator for 15-kV Switchgear Applications.

June 18, 2001

Production Flexibility at S&C Brings a Speedy End to a Plant Outage.

June 11, 2001

Watch the Checkout of a Trans-Rupter II® Transformer Protector.

June 4, 2001

Does the Micro-AT Source-Transfer Control use a negative or zero sequence calculation to determine if it should initiate a transfer? Which method is better?

May 29, 2001

S&C’s No-Outage System Gaining Popularity Among Major Utilities.

May 21, 2001

S&C System VI™ Switchgear . . . “Top of the Class” for a High School Upgrade.

April 30, 2001

Externally Powered CCU-XP Control Offers Unbeatable Features.

April 30, 2001

Relay Panel Upgrade to Improve Reliability in the Southeast.

April 23, 2001

All the Protection Your Transformers Need — At Unprecedented Cost Savings.

April 23, 2001

S&C Metal-Enclosed Switchgear — Versatility in Custom Applications.

April 16, 2001

How to Select a Transformer Protective Device Based on the Secondary-Fault Current Rating

April 9, 2001

Averting a Potentially Calamitous Situation at a Municipal Utility.

April 9, 2001

A Flexible Solution for Mobile Substations: Trans-Rupter II® Transformer Protector.

April 2, 2001

S&C Products Solve Complex Problem for Suburban Utility.

March 26, 2001

Improved Safety and Operating Simplicity for Medium-Voltage Switchgear.

March 26, 2001

Outdoor PureWave UPS™ System — A Unique Power-Quality Solution for Data Centers.

March 19, 2001

S&C Investigates Mysterious Phenomena at High-Tech R&D Facility.

March 11, 2001

S&C and EnergyLine Design Unique Integrated Switchgear Package in Record Time.

March 11, 2001

Low-Voltage PureWave UPS™ Named a Finalist in CEE News Product of the Year Platinum Award Contest.

March 5, 2001

S&C Pad-Mounted Gear — Another Example of “More for Less.”

March 5, 2001

Wildlife Contacts Result in Costly Power Outages for Government Facility.

February 26, 2001

An Economical Solution for Upgrading S&C Mark-Series Circuit-Switchers: Trans-Rupter II® Retrofit Kits.

February 19, 2001

U.S. Air Force Awards Turnkey Substation Expansion Project to S&C’s Power Systems Services.

February 12, 2001

Metal-Enclosed Switchgear for Unusual Requirements.

February 5, 2001

Large Utility in Southeast U.S. Awards Power Systems Services a Major Transmission-Engineering Project.

January 29, 2001

Switchgear For Today’s Needs . . . and Tomorrow’s Power Quality Requirements.

January 22, 2001

S&C’s Phase-Over-Phase Circuit-Switcher: A Reliable, Pole-Mounted Line Switch for Transmission Systems.

January 14, 2001

Announcing the New “DR” Speed Fuse Link.

November 11, 2000

Low-Voltage PureWave UPS™ Named a Finalist in Plant Engineering’s 13th Annual Product-of-the-Year Contest.

November 11, 2000

PureWave UPS™ Protects Entire Semiconductor Fabrication Facility.

November 3, 2000

S&C’s Power Systems Services Meets Aggressive Schedule for Critical Maintenance of Substation Circuit Breakers.

October 20, 2000

First Trans-Rupter II® Installed and Energized in Pacific Northwest, Provides Economical Solution for Retrofit Application.

October 6, 2000

Major Utility Names S&C a Top Engineering Services Supplier, Awards S&C Nearly 30 New Engineering Projects.