S&C Electric Company
April 19, 2004

IntelliTEAM II® Automatic Restoration System Online Demonstration!

IntelliTEAM II Demonstration

Now you can see the IntelliTEAM II® Automatic Restoration System in action on S&C’s website. The new IntelliTEAM II Online Demonstration realistically shows the operation of a distribution system during fault interruption and restoration.

Users can choose from four different fault scenarios on the same circuit: Loss of Source, Faulted Circuit, Faulted End Load, or Multiple Faults. Each step of the restoration process is shown with a 1-line indicating the current state of the system, plus event and elapsed timers, and a detailed explanation of what is happening. Placing the mouse over switch labels displays phase amperages.

All four scenarios are derived from examples run on the S&C IntelliTEAM II Test System. The Test System uses actual switch controls and communication devices along with computer-controlled signals to simulate a wide range of circuit configurations.

The demo requires the Macromedia Flash Player 7, which is a free download.

See the demo now . . . click here!

For more information on the IntelliTEAM II Automatic Restoration System, contact your local S&C Sales Representative.