Inspections
Routine inspections of electrical equipment can detect emerging problems before they escalate to the point requiring a forced outage. Some inspection procedures can be performed with the equipment energized, eliminating the need for a scheduled outage. Upon completion of the inspection, a report is issued, identifying and prioritizing the maintenance recommendations. Using this report, S&C field crews and you can implement a scheduled maintenance program. S&C’s field personnel have extensive experience in comprehensive inspection programs for the following:
- Complete industrial electrical distribution systems
- Circuit breakers
- Circuit-Switchers
- Metal-enclosed switchgear and panel boards
- Pad-mounted gear
- Transformers